The Anhui provincial government approved that two expressway toll stations should be set up to collect fees.

The Anhui Provincial Government recently approved the establishment of Qingcao Toll Station on the Wuwei-Yuexi section of the Shanghai-Wuhan Expressway, and agreed to set up Bowang Toll Station on the G4221 Huwu Expressway. The two toll stations will be charged from the date of opening.

According to the reply, Qingcao Toll Station will end on October 27, 2053, and Bowang Toll Station will operate until December 30, 2043. The charging standard and free range shall be implemented in accordance with the relevant regulations of our province. From the day of charging, the charging unit will set up a bulletin board at the toll station, announce to the public the charging documents approved by the provincial government, charging items, charging standards, starting and ending time of charging and supervision telephone number, adhere to civilized duty and charging, and consciously accept the supervision of departments such as transportation, development and reform, auditing and market supervision.

(Anhui Business Daily Rong Media Reporter Liu Yuanyuan Intern Xiang Li)

Taikang County, Henan Province: Upgrading and controlling the intersection of expressways and national and provincial highways.

According to the news of @ Taikang County Rong Media Center, Taikang County Epidemic Prevention and Control Command issued a notice on upgrading and controlling the intersections of expressways and national and provincial highways.

In order to effectively cope with the current severe epidemic situation, guard against the risk of epidemic input, and safeguard the life, health and safety of the people in the county and the vast number of people returning to Taiwan, the county epidemic prevention and control headquarters decided to set up epidemic prevention and control inspection points at all highway intersections, national highways entering the county, bus stations and other places in the county from 0: 00 on January 4, and the people returning to Taiwan by car must verify their health codes and travel codes, and show negative proof of nucleic acid detection within 48 hours. For those who fail to issue certificates, guide them to the temporary sampling point for nucleic acid sampling. After sampling, they can enter Taitai on the premise of signing a letter of commitment and doing personal protection. Before the results are obtained, they are not allowed to take public transport, participate in mass activities or go to crowded places, and can only conduct normal activities after the nucleic acid test is confirmed negative. Those who refuse to cooperate with the inspection and violate the relevant provisions on epidemic prevention and control will be held accountable according to the law. The removal time of epidemic prevention inspection points will be notified separately according to the situation of epidemic prevention and control.

State Grain and Material Reserve Bureau: Strengthen the emergency relief material guarantee.

CCTV News:The State Grain and Material Reserve Bureau held a video conference on the safety production of the national grain and material reserve system on the 27th. The meeting profoundly learned the lessons from relevant accidents and re-mobilized, re-deployed and re-implemented the current safety production work in the field of grain and material reserves.

  The meeting pointed out that it is necessary to draw a profound lesson, attach great importance to the work of safety in production, strengthen the political responsibility for safety in production, and enhance the sense of responsibility and sensitivity. We must adhere to the problem-oriented and bottom-line thinking, and fully understand the security risks in the fields of grain and materials, such as rotation of reserve materials, grain storage, infrastructure construction, fire safety and daily management.

  The meeting demanded that detailed safety measures should be implemented, the bottom line of safety production should be firmly adhered to, and safety production measures should be put in place.

  First, we must tighten the responsibility for production safety, strictly implement the requirements of "three tubes and three musts", conscientiously implement the leadership responsibility, comprehensively consolidate the main responsibility, earnestly assume the supervision and management responsibility, do not shirk or shirk, fulfill their duties, and tighten the chain of safety responsibility.

  Second, we must quickly carry out a major investigation of production safety, based on the actual situation of the system, and solidly carry out a major investigation of hidden dangers of production safety risks in the whole system and industry and a major rectification action of centralized fire safety. The action should be rapid, the investigation should be comprehensive, the rectification should be in place, the supervision should be strict, and the safety situation should be effectively maintained.

  Third, we should strengthen the safety control of key links, pay close attention to high-risk links such as major hazard sources, inspection and maintenance, focus on fire prevention, freezing prevention, electric shock prevention, poisoning prevention and traffic accident prevention, strictly implement the management system and special operation requirements for hazardous chemicals warehouses, strictly implement the regulations for grain leaving warehousing operation, strengthen the safety management of third parties, and pay close attention to control, and never "work with diseases".

  Fourth, we should properly arrange the production and business activities during the Spring Festival, adhere to the principle of safety first, and make overall arrangements for the production and business activities in the recent period to effectively prevent accidents caused by rushing to catch up with the construction period and schedule and neglecting safety production.

  Fifth, we should solidly promote the three-year action of tackling the root cause of safety production, plan the project of improving safety capacity, promote "civil air defense, technical defense, engineering defense and management defense", form an atmosphere of "everyone stresses safety and everyone can respond to emergencies", mobilize the masses and employees to report or report the hidden dangers around them, and build a strong people’s defense line for safety production.

  Sixth, we must constantly strengthen the material support for emergency relief. In view of the recent disaster-prone situation in some areas of China, we must do a good job in the "three implementations" of materials, strength and plans, and make unremitting efforts to ensure emergency material support. Establish a "first report" mechanism for major disasters and emergencies, improve emergency plans, strengthen emergency drills, strengthen duty, and further optimize the scale, layout and variety structure of emergency materials reserves to ensure that they are available, adjusted quickly and used at critical moments.